Another project is finished

I have completed the counter top project in the motorhome. It went better than I thought it would when I first started. Taking the sink and counter out was no problem  ,the only really hard part was moving the drain pipes around. the old sink drained from the right side and the new one drained from the left side so I had to fiddle around to get it to work without changing all the drain pipes. Now it is time to rest .Tonight the girls are singing at a conceet so I will be going to that and tomorrow I don’t plan on anything productive. Sunday around lunch time I am driving the bus for a 2 days. Here are 2 pictures of the counter and sinks befor and after .we are happy with the result.

 

Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s